Badby Church Bells Improvement Project Report #10

More volunteers than expected turned up on Wednesday morning to help Neil Deem, the professional in charge.  He managed to keep them occupied. The clappers and much of the timber fittings – stays, sliders and slider guides, pulley boxes and frame side were hoisted and stored in the bell chamber.

Timber fittings stored on the floor under the treble bell

Bell 4 needed to have its new bearings fitted and then Neil was free to supervise the hoisting of bells 4, 2 and 3.  The most fit volunteers took the brunt of the hard work operating the manual chain hoist to haul them some 40ft above ground. There is insufficient headroom in the bell chamber to fit in an electric hoist and leave enough space for smaller manual hoists to help move the bells from the central access trap to the different parts of the bell frame.

Bell 4 has lift off! This bell was recast in 2000 so it is the second time this century that it has been hoisted up the tower!

Bell 4 went straight to its place, but just resting until final positioning.  Bell 2 then 3 were placed on supports beside the frame.  This allowed the cast iron frame member between bell pits 2 and 3 to be moved back into place.

Bell 2 ‘parked’ on supports until it can be moved into its proper place to the right. The repaired side cross braces for the frame (green) are standing at the top left of photo awaiting fitment when bell 2 is in its place.

While this was going on, the top half of the wheels for bells 5 and 6 were mated to the bottom halves and bolted onto the headstocks (red).

The bottom halves of the wheels have to be threaded around the bells’ soundbow before the bearings are bolted down. They are then bolted to the upper halves to produce the large diameter flanged wheel giving the ringer a lot of leverage when pulling the rope below. The whole wheel is then bolted to the tenor headstock (red)

Some metal fittings were getting a second coat of enamel in the clock chamber.

 

More painting

By the end of the day 3 bells had their clappers installed.  This is not an easy job because the heavy clapper and its top bolting assembly (‘crown staple’) have to be held by someone crouching inside the bell while the first nut is quickly spun down!

Accurate bolting down of the bearing blocks continued until xxpm.

Placing the bearing blocks accurately in place for bell 4.

Meanwhile some Badby ringers were having the last of their 35 Wednesday practices elsewhere, this last time at Staverton.