Day 2 starts with a ginny wheel being affixed to the tower roof beams and the new half wheels hoisted.  The bottom halves of the wheels into the bell chamber because they have to fit around the bell as it is lowered into its frame pit.  The top halves were stored in the clock chamber to get them out of the way,

Hoisting half wheels up from ground level to clock chamber.

The first bell to be hoisted using a manual chain hoist was bell 5.

Bell 5 leaves the floor
Bell 5 approaching the clock chamber
Bell 5 half way up in the clock chamber
Keeping the hoist chains steady
Where the hard work is taking place
Bell 5 pokes up through the bell chamber floor

When it was at frame level another chain hoist was fixed over the north west corner tower roof beam and attached so that the interplay of the two hoists could swing the bell over the frame and into its pit – back home after 258 days away!  It is now resplendent with its new canon retaining headstock (red) complete with new bearings (blue)

Neil fixes the second chain hoist to the north west roof beam
Bell 5 moves across the top of the frame (green)
Bell 5 back ‘home’ after 258 days away. This is the bell that sounds the clock hours.

While all this was going on there was an artist at work in the clock room painting new brackets (green) and wheel braces (red).

In the clock room painting new brackets (green) and wheel braces (red).

 

By working through till 6.30pm. the treble was hoisted and parked back in its place.

The treble bell (bottom right) joins 5 (top left) and tenor (heaviest top right) back in place.