Badby Church Bells Improvement Project Report #4

Today (Thursday), investigation of the end of the main beam within the west wall, which holds the bell frame in the tower, showed very little corrosion.  The cause of the masonry cracking was put down to there being less concrete around the end than would normally be expected and that the mortar around the concrete had cracked.

The west end of the south main beam showing the beam and shunt stops in surprisingly good condition before being cemented firmly back in.

There was a lot of corrosion along the bottom angle of the south frame and this had to be lowered down the tower to be taken away for repair.  Volunteers had to be called in for this, so thanks to Pete and Simon who assisted at short notice.

The south bell frame starts its descent
South bell frame reaches the ground
South bell frame ready to carry out to van

The van had to be partly unloaded to get the frame in, but it all fitted in well.

The south frame just goes into van

That left the floor pulleys for two bells to be removed from the clock-room floor

The ground pulley for bell 1 on the clock-room floor
The ground pulley removed for renewal

Neil was due to finish late afternoon and set off home.  We next expect to see him when the frame painting begins in July.